1> Replaced timing loop and tested.
2> Got FM radio broadcast of PA system operating (trailers many need an outside antenna to receive signal if there is trailer interference).
3> Installed new caution horn system (tested with temporary power supply) power supply to be added.
4> Changed channels on wireless mic system to fix drop out problems.
5> Constructed ten (10) individual step up platforms for use on driver's stand if needed.
6> Fixed floor plank on driver's stand.
7> Fixed impact wall bracing pins in turn one.
8> Sealed Track Surface.